Genesta acquired Solrød Logistik off-market while it was still under construction, in a transaction with Logistic Contractor A/S, part of the Wästbygg Group. The developer had secured 48,000 m² of land adjacent to the E20 for the project, with groundwork and detailed planning starting in autumn 2023, construction from early 2024 and handover to Genesta at the end of that year.
The building shares its design approach with Enköping Logistikcenter, the 80,000 m² facility the same developer delivered to Genesta — smaller in scale, but drawing on the same routines and specification. Sustainability was designed in from the outset, in line with the EU taxonomy and aiming for BREEAM certification at the Excellent level.